One chain, no re-keying
Quote to order to job to measured work to invoice. The same record carries through, so the figure you were quoted is the figure that gets built and billed.
How we work
Six stages from first survey to final payment. The point of running it this way is simple: at any moment you can ask what was built, by whom, under which permit, to which spec and at what cost, and get an answer the same day.
We walk the route before we price it. Buildability problems, the ones that turn into variations later, get flagged while they are still a conversation rather than a claim. Pricing comes off a rate card, so every line is checkable and the same rate applies on job one and job fifty.
Notices and permits go in against the programme, not after it. Traffic management is designed for the site rather than lifted from the last one, and it is booked, costed and recorded against the job so nothing about it is a surprise at valuation.
Gangs are planned on a live week-by-week grid, so we commit to dates we can hold. Before anyone is booked onto a job, the system checks their tickets and competencies are current. An expired ticket blocks the booking rather than being discovered by an auditor six months later.
Site diary, photographs, measured work, materials and plant are all captured at the job as the work happens. Reinstatement is recorded the same way. Nothing is reconstructed from memory at month end, because that is where disputes are born.
Measured work is agreed with you before it is billed, and once a measure has been invoiced it is stamped, so it cannot be billed twice. Applications go in clean, which is why they get certified rather than queried.
Test results, as-builts and the compliance pack are handed over complete. Then we stay reachable for the alterations, the defects and the third party strikes that follow any live network.
Safety and compliance
Tickets expire. RAMS get out of date. Toolbox talks get skipped when a job runs late. We track the lot continuously rather than pulling it together the week before an audit, which is the only way the record is true when somebody checks it.
Accreditations
The system behind it
Quotes, orders, jobs, gang planning, measures, compliance, invoicing and a rolling cashflow forecast all sit in one place, built around how this work actually runs rather than adapted from generic construction software.
Quote to order to job to measured work to invoice. The same record carries through, so the figure you were quoted is the figure that gets built and billed.
Progress on an order, spend against a job, who was on site on a given day: these are lookups, not investigations.
A thirteen week cashflow forecast built from the live order book, so we take on work we can actually resource and fund.
Send the scope and the build standard. We will walk you through how it would be planned, permitted, measured and handed over.